Short answer: anti-termite treatment for a new house is done in stages while the foundation and floors are being built, not after. The soil in the foundation trenches, the filling under the floors and the ground around the house are all treated with an approved termiticide (see the US EPA guide to termite control). Once the floors are laid, the soil underneath can no longer be reached.
Why Termites Are a Serious Problem in Lahore
Termites live in the soil and come up through cracks, joints and pipe holes. They eat wooden doors, frames, cupboards and even the paper on gypsum boards. Damage often stays hidden until a door frame crumbles. Lahore's soil and climate suit termites well, so treatment is not optional.
The Steps of Pre-Construction Treatment
- Foundation trenches: the bottom and sides of every trench are sprayed before concrete or brickwork starts.
- Backfill around foundations: the soil filled back around the foundation walls is treated layer by layer.
- Plinth fill under floors: the earth filling under the ground floor is treated just before the floor base is poured.
- Pipe and cable entry points: the soil around every pipe and conduit that enters the house gets extra treatment.
- Outside the house: after construction, a band of soil around the outer walls is treated to stop termites coming in from outside.
Already Living in the House?
An existing house can still be treated. Small holes are drilled along the walls and floor joints, and the chemical is injected into the soil below. It works, but it costs more than treatment during construction and disturbs the floors.
How to Check It Was Done Properly
- Ask which chemical is used and see the sealed containers on site.
- Be there for at least one stage, such as the plinth fill.
- Get the dates of each stage and the area treated in writing.
- Ask for a written warranty. Ours is 5 years.
What Affects the Cost?
The cost depends on the area treated, the chemical used and whether it is a new build or an existing house. Use our termite treatment calculator for an estimate, and book a site visit for an actual quote.
Building a new house? Termite treatment is included in our grey structure work. See our services for treatment of existing houses.
Frequently Asked Questions
When should anti-termite treatment be done on a new house?
During construction, in stages: the foundation trenches, the backfill around the foundations, the plinth fill under the floors, and finally the soil around the outside walls. The soil under the floors cannot be reached once they are laid.
Can termite treatment be done on an existing house?
Yes. Holes are drilled along the walls and floor joints and the chemical is injected into the soil below. It costs more than treatment during construction.
How long does anti-termite treatment last?
A properly done treatment lasts several years. Ask for a written warranty; ours is 5 years.